EU-first AI for energy & utilities

Make maintenance knowledge easier to use.

Prepare work packs and handovers from approved manuals and historical maintenance records.

For asset operations directors, maintenance planners and field-service knowledge leads. Start with approved data and a named reviewer.

Editorial illustration of a wind turbine connected to its technical manual

Illustrative scenarios for evaluation. Not a Matrix customer story or a preconfigured industry solution.

The recurring work

Planners gather asset history, work orders and manuals across separate systems. The next crew needs a clear, current pack, while engineering and operational authority must stay explicit.

AI workflows for energy

Illustrative workflow
Your approved sourcesFiles, records and the task brief
Matrix workspaceAgents, tools and a working draft
Your reviewA maintenance handover with traceable references
Matrix / Asset operations / Maintenance planning
The work pack, with its references.
Sample assetPump / P-042
Work orderHistorical / WO-018

Maintenance handover draft

Inspection notes record vibration at the last visit. The follow-up record is missing from the supplied export.

Work-order export / WO-018
Manual revisionCheck against the approved document registerVerify
Supervisor actionConfirm the observation and next stepsReview

Document assistance. No live system control.

Illustrative example · sample data · not a live system

The inputs and tools

  • Public or redacted asset manuals
  • Historical maintenance work-order exports
  • Approved handover template and document revision rules

Begin with uploaded documents and CMMS exports. No connection to SCADA, operational technology or live control systems in the pilot.

Every pilot begins with an agreed data sample, agent/provider configuration and a named reviewer. An export-based pilot does not establish a live integration.

A bounded first pilot

One asset class, ten historical work orders, two weeks. Prepare draft maintenance handovers and compare them with supervisor-reviewed records.

What to measure

Check revision accuracy, missing observations, unsupported instructions and preparation time with the supervisor.

Where a person stays in charge

Engineers approve technical instructions, work permits and dispatch. No switching, protection settings, physical control or safety decisions are automated.

Questions for your evaluation

Does this pilot connect to operational control systems?

No. Start with approved manuals and historical maintenance exports. Keep SCADA, operational technology, switching and protection settings outside the pilot. Engineers and supervisors retain technical and safety authority.

Review European hosting and privacy considerations and self-hosting options before introducing sensitive data.

Why this workflow

The IEA distinguishes planning and maintenance assistance from direct system control and discusses the importance of data and checkable outputs.

IEA: AI-enhanced solutions for electricity grids

The source establishes sector context. The use cases, pilot scope and evaluation measures above are Matrix’s proposed starting points; performance and fit must be tested with your team.

The workspace behind the workflow.

Keep the task, your files and the tools you build in the same Matrix computer. Start with work-pack preparation, then shape the workspace around your team.

Explore Matrix Desktop
Matrix Desktop product screenshot showing the cloud workspace and its tools
Matrix Desktop product screenshot. Industry scenarios on this page are illustrative.

Explore another part of your business.